|
|
CalContractor Profiling
The California Contractor
|
CalContractor Magazine is published 12 times each year by Construction Marketing Services and distributed to over 10,000 contractors in the state of California each month. CalContractor features local editorial with contractor profiles, job stories and local industry news. Let us help you put your image in front of the decision makers that purchase construction equipment in the state of California. |
| For Advertising |
Kerry Hoover - Southern California
P.O. Box 892977 • Temecula, CA 92589
(909) 772-3121 • (951) 225-9659 Fax
khoover@calcontractor.com
Dutch Meads - Northern California
(209) 679-1278 • (209) 838-6171 Fax
ironmanads@yahoo.com |
| Editorial Submission |
Kerry Hoover
P.O. Box 892977 • Temecula, CA 92589
(909) 772-3121• (614) 791-9563 Fax
khoover@calcontractor.com |
| |
| 2010 Advertising Rates - 4/Color |
Size
Page
1/2 Page
1/4 Page
|
1x
$1,970
$1,260
$825 |
6x
$1,725
$1,165
$780 |
12x
$1,600
$1,050
$730 |
| Rates include full-color layout and design. 15% discount if disk, film or camara ready art are provided. Electronic format preferred. |
| 2010 Special Position Rates - |
Back Cover
Inside Front Cover
Page 3 (Inside Front Cover Facing)
Inside Back Cover |
$1,900
$1,830
$1,760
$1,760
|
| Special Position Requests |
Full Page
1/2 Page |
$1,675
$1,100 |
| Mechanical Requirements |
|
Width |
Depth |
Page (Bleed)
Page Trim Size
Page (Type)
1/2 Horizontal
1/4 Square |
8.25"
8"
7"
7"
3.425" |
10.75"
10.5"
9.5"
4.625"
4.625" |
Acceptable platforms and software - Files may be produced on Macintosh or PC platforms using QuarkXpress, Adobe Photoshop, Adobe Illustrator and Adobe Acrobat. High Resolution Print Ready PDF Files are preferred.
Acceptable media: PC or Mac Formatted
CD-ROM or DVD-ROM. CMS also has an FTP site available for large file transfers if needed.
For any questions regarding file preparation, please contact CalContractor at: mbrady@calcontractor.com |
|
| |
2010 Editorial Calendar & Deadlines |
January 2010 - Crane & High Reach Issue
Closing Date: December 21, 2009 |
February 2010 - Golf & Resort Construction
Closing Date: January 18, 2010 |
March 2010 - Underground Construction
Closing Date: February 22, 2010
|
April 2010 - Equipment Guide
Closing Date: March 22, 2010
|
May 2010 - Asphalt Construction
Closing Date: April 19, 2010 |
June 2010 - Demolition & Recycling
Closing Date: May 24, 2010 |
July 2010 - Compact Equipment
Closing Date: June 19, 2010 |
August 2010 - Concrete Construction
Closing Date: July 19, 2010 |
September 2010 - Owner/Operator
Closing Date: August 23, 2010 |
October 2010 - Specialty Contractor
Closing Date: September 20, 2010 |
November 2010 - Landscaping Construction
Closing Date: October 19, 2010 |
December 2010 - Grading & Excavating
Closing Date: November 22, 2010 |
|
| |
|
|
|